Language
Chinese
English

ABOUT HANGDA

Adhering to green development, with the mission of "Building green and clean energy and protecting the common home of mankind", it focuses on the r&d, production, sales and service of energy storage products. It is a first-class supplier of energy storage products and systems, microgrid, smart energy and energy Internet overall solutions in China.

Build green and clean energy and protect the common home of mankind.

To become a leader in the energy storage industry and a protector of the earth's environment.

Integrity, responsibility, innovation, dedication.

hangda

PRODUCT

 Pencil

Pencil

Wire harnesses are widely used in automobiles, household appliances, computers and communication equipment, various electronic instruments and meters, etc., such as low-voltage acquisition wire harnesses, connecting wire harnesses, high-voltage wire harnesses, etc.
 Aerogel

Aerogel

Add an insulation layer between the battery cells to block thermal runaway and avoid chain reactions caused by overcharging, puncturing, and collisions.
 Heating film

Heating film

Heating film, also known as polyimide heating film, is a sandwich structure of metal flexible electric heating film. It is synthesized as a whole by combining the polyimide film and the heating core body. The heating core body is a metal thin sheet, and its resistance has excellent stability. The insulation body is a polyimide film, which has good insulation strength, excellent electrical resistance, and high thermal conductivity efficiency.
 FPC

FPC

The FPC connection board integrates NTC and fuses to monitor the temperature and voltage of the power battery pack in real time. The collected data is fed back to the BMS. If it exceeds the set safety range, the collection board fuse will be blown in a timely manner to ensure the safe and reliable operation of the power battery.
 Energy storage battery cabinet

Energy storage battery cabinet

HD069048、HD023048 Industry exclusive based on munion electrical and structural connections Parallel control algorithm of off grid bidirectional inverter The service life is more than 10 years
 Integrated energy storage machine

Integrated energy storage machine

HDS046030、HDS046036、HDS060040、HDS060046、HDS070050、HDS070056 Simple connection and installation, saving installation time and cost Scalable system design for easy expansion Home Smart Energy Overall Solution
 Optical storage and off grid integrated machine

Optical storage and off grid integrated machine

HDM033400、HDM055400、HDM110400、HDM165400、HDM275400、HDM550400 flexible Multiple working modes can be set flexibly Flexible support for lithium battery and lead-acid battery The photovoltaic controller can be expanded to facilitate the flexible configuration of photovoltaic capacity convenient The integrated scheme supports the simultaneous access of load, battery, power grid and diesel generator photovoltaic INTEGRATED EMS function, safe and stable power supply and maximum utilization of new energy reliable Prediction of battery capacity and discharge time Can and RS485 interface, MODBUS communication protocol And seamlessly switch the off grid state to continuously supply the load Built in isolation transformer has strong load adaptability Perfect protection function to protect inverter and battery
 Box type energy storage converter

Box type energy storage converter

HDL1000、HDL 1260、HDL 2000、HDL 2500 IP54 protection grade Easy construction and installation Customizable development Applicable to various battery types and configurations High reliability and maintainability
 Integrated energy storage booster

Integrated energy storage booster

HDL1000-35、HDL1260-35、HDL2000-35、HDL2500-35 Design leadership Standardized design, easy expansion and maintenance Independent design of air duct, good heat dissipation environment New IGBT module, high efficiency conversion Leading technology Support multiple battery inputs to effectively improve battery cycle life High frequency switching, low current ripple and high voltage quality Support parallel system, and the capacity can be expanded to MW level High value Built in EMS function to reduce customer investment cost

NEWS

29 12
HANGDA
With a total investment of 900 million yuan, Leiyang energy storage peak shaving power station demonstration project was signed
Leiyang energy storage peak shaving power station demonstration project and energy storage integrated industry university research science and Technology Industrial Park project are the sharing and cooperation platform between CLP international and hangdatong. The three-dimensional new industrial cycle scheme of increasing storage in substations is adopted to realize the development mode of complementary integration of grid dispatching photovoltaic and wind power generation.
14 03
HANGDA
Consultation meeting on matters related to the relocation and acceptance of pole pipelines of Wanpeng times, Hangda electronics and Wanhua Hexiang
Consultation meeting on matters related to the relocation and acceptance of pole pipelines of Wanpeng times, Hangda electronics and Wanhua Hexiang
09 03
HANGDA
Leshan Hangda team new energy industry special training meeting
Leshan Hangda team new energy industry special training meeting
24 12
HANGDA
Signing ceremony of Leshan manufacturing industry investment attraction "100 day tackling key problems" action investment project
Signing ceremony of Leshan manufacturing industry investment attraction "100 day tackling key problems" action investment project

HANGDA

Service Tel 0833-6328888
Contact us
Add: 6th Floor, Comprehensive Office Building, Demonstration Zone of Zhejiang Leshan East West Poverty Alleviation Collaborative Electronic Information Industry Park

Copyright © 2021  Leshan Hangda Energy Storage Technology Co., LTD  All Rights Reserved   蜀ICP备2022004654号  Website300.CN   SEO